Guidance > Technical > Other Guidance > Preventing CGA Rig Instability
CFA Piling: Preventing ground & rig instability through over-flighting
Download the full document in pdf format
1. INTRODUCTION
The purpose of this document is to outline the key factors that may lead to settlement or instability of the piling rig when carrying out Continuous Flight Auger (CFA) piling as a result of over-flighting and to present best practice to mitigate these risks. This document is not intended to replace the requirements to use competent supervision and operatives when carrying out CFA piling. This guidance will be of interest to piling contractors, geotechnical designers, planning supervisors and others concerned with the specification, selection and procurement of works involving piling.
|
Documents Available
Technical note on the use of BR470 in soft clay
CFA Piling: Preventing ground and rig instability through over-flighting
Hydraulically Bound Working Platforms
Design of Piles to Eurocodes
Design of Bored Piles in Chalk
Piling into Contaminated Land
Bentonite Support Fluids
Use of Debonding Foam
Breaking Down of Piles
Unexploded Explosive Ordnance
|
|