Guidance > Technical > Other Guidance

Other Technical Guidance

Technkical note on the use of BR470 in soft clay

View guidance

Design of Piles to Eurocodes  (Position Paper)

View guidance

Design of bored piles in chalk

FPS Position on the use of CIRIA Report PR11.

View guidance

Piling into Contaminated Land

A list of helpful guidance documents published by the Environment Agency.

View guidance

Bentonite Support Fluids

Information to assist the decision whether or not a particular bentonite will produce a satisfactory support fluid.  Guidance on the preparation, use, re-use and disposal of the bentonite slurry, and also on methods of testing.

View guidance

 Unexploded Explosive Ordnance (UXO)

The legacy of unexploded explosive ordnance (UXO) occasionally leads to problems on construction projects in the UK.  These problems have led to delays and increased costs, especially during the groundwork phases of construction.  The CIRIA guide “Unexploded Ordnance (UXO) – a construction industry guide” presents industry best practice for the assessment and management of UXO risk for construction projects. This note summarises some aspects relevant to piling and ground improvement contractors.

View note

FPS Reference Material - Temporary Works

The aim of this document is to provide a simple summary of temporary works items that are commonly associated with the various forms of ground engineering that FPS members may undertake. This is designed as an aide memoir for FPS members, main contractors, engineers and their clients and does not constitute a definitive list of temporary works that could be encountered on site. In particular this does not remove the need for individual organisations to undertake site specific assessments of temporary works requirements. Statutory legislation and the Contract will define the respective responsibilities of the parties involved to manage the design and checking of temporary works.

View document

 

Documents Available

Technical note on the use of BR470 in soft clay

CFA Piling: Preventing ground and rig instability through over-flighting

Hydraulically Bound Working Platforms

Design of Piles to Eurocodes

Design of Bored Piles in Chalk

Piling into Contaminated Land

Bentonite Support Fluids

Use of Debonding Foam

Breaking Down of Piles

Unexploded Explosive Ordnance