Guidance > Technical > Site Investigation

FPS Survey of Site Investigation Reports

In a survey of over 220 projects awarded between July and September 2006 FPS members found the site investigation to be so poor that in a third of cases optimum piling or ground improvement solutions could not be provided. The survey found the following:

 

  • The most basic of information was frequently missing;
  • Twenty percent of piling contracts had no borehole;
  • In nearly 60% of cases there was inadequate topographical information;
  • Rarely was a proper geotechnical Desk Study undertaken;
  • In more than half of the projects surveyed environmental concerns dominated the investigation at the expense of the geotechnical element which was often compromised or absent;
  • Information freely available was often not passed to the contractor (in 17% of contracts borehole location plans were not provided, rendering useless any borehole information).

 

pdf fileDownload the full document in pdf format

 

 

 

Documents Available

pdf fileFPS Survey of Site Investigation Reports

pdf filePublished Minimum Requirements for Site Investigation