Guidance > Technical > Pile Schedule

FPS Pile Bearing Schedule Guidance Note

Some of the biggest potential sources of delay and non-conformance with pile construction are untimely and ambiguous pile design information.

The FPS has therefore prepared a simple Excel based spreadsheet to assist both engineers and piling contractors with the provision of pile design schedules.


The purpose of this guidance note is to provide an introduction for use of the spreadsheet.

 

 

pdf fileDownload full document in pdf format

 

 

 

 

 

 

Documents Available

pdf file FPS Pile Bearing Schedule Guidance Note

Excel file Electronic Pile Bearing Schedule

Excel file Electronic Pile Bearing Schedule (for use with Eurocodes)